Technical Resources
Gear Coupling Lubrication Checks Before Start-Up
Before operating a gear coupling, confirm the approved lubricant, the fill quantity and units, the filling method and the next service interval for the exact model. Inspect the seals and plugs, then confirm whether the coupling was filled during asse
Before operating a gear coupling, confirm the approved lubricant, the fill quantity and units, the filling method and the next service interval for the exact model. Inspect the seals and plugs, then confirm whether the coupling was filled during assembly. For equipment returning to service, check the maintenance record for the product and amount already inside.
How do you choose gear coupling grease?
Start with the coupling manufacturer's lubricant specification and the actual speed, temperature and mounting position. For a grease-lubricated model, check the required consistency, base oil viscosity and resistance to separation under rotation where specified. Two greases with the same NLGI grade can have different base oil viscosities and separation characteristics. If an oil system is specified, follow the oil grade and supply requirements for that design.
Lubricant substitution needs approval for the actual duty. If the existing product is unknown or the new grease has a different formulation, confirm compatibility and the manufacturer's cleanout or changeover procedure before adding it. General guidance on selection and lubrication methods is available from AGMA's flexible coupling lubrication standard.
What does the grease quantity in a catalogue mean?
Check the exact series and size, then read the entire column heading. Confirm whether the figure applies to the complete coupling or a specified chamber, and whether it refers to the initial fill or a service operation. Rongxing lists GCLD grease by volume and WGZ grease by total mass.
| Rongxing model | Catalogue field | Listed quantity |
|---|---|---|
| GCLD1 | Grease quantity | 107 mL |
| GCLD2 | Grease quantity | 137 mL |
| WGZ1 | Total grease mass | 0.11 kg |
Use the table for the model on the machine. If a procedure requires a conversion, use the approved lubricant's density and confirm that both figures refer to the same fill scope. Ask for the model instructions if the quantity table leaves the filling sequence or service interval unclear. GCLD model table · WGZ model table

What should the start-up record contain?
Identification. Record the series, size, arrangement, mounting orientation and drawing or manual revision.
Lubricant and fill. Record the approved product or specification, quantity, unit and the location or chambers to which it applies. Note the fill actually used and whether the assembly arrived prefilled.
Method and condition. Confirm the instructions for filling and venting where applicable. Inspect the specified seals, plugs and fittings for damage or leakage. If grease has escaped, check where it leaked before topping up.
Service schedule. Record the next inspection and relubrication due date or operating hours. Check whether the manufacturer's schedule changes with speed, temperature, contamination or duty.
For a new installation or a coupling that has been opened, verify the installation gap and alignment against the approved tolerances as part of the start-up check. Gear coupling gap and alignment guide